Extensions
Single and double storey, side returns and wrap-arounds, garage and loft conversions. Planning, structural calcs and building control included.
We handle the design, the drawings, the planning and the build — so you deal with one company from first sketch to final certificate. Fixed written price before anyone lifts a tool.
We don't take on everything. Extensions, kitchens and bathrooms are what we build week in, week out — including the structural work most fitters subcontract out.
Single and double storey, side returns and wrap-arounds, garage and loft conversions. Planning, structural calcs and building control included.
Full refits, knock-throughs and open-plan kitchen-diners. Steelwork, first-fix electrics and plumbing done by our own trades.
Family bathrooms, en-suites and level-access wet rooms. Tanking, tiling and certified electrics — finished in two to three weeks.
We measure up, look at drainage, access and structure, and talk honestly about what your budget will and won't stretch to.
Concept layouts, then full plans. We confirm permitted development or submit the planning application to the council on your behalf.
Itemised by stage, with a start date and a payment schedule. The price only changes if you change the spec — in writing.
One site manager, one number to call, weekly photo updates and a tidy site. Building control inspect at every stage.
We walk the job with you, clear the snags, and hand over completion certificates, warranties and a 10 year structural guarantee.
A 1930s semi with a dark galley kitchen. We took the rear and side out to the boundary, opened the ground floor with two steel beams and rebuilt the kitchen around a 3.6m island.
Published ranges from our own completed jobs, including materials, labour, drawings and building control. Your quote is fixed after the survey — these are here so you can sanity-check your budget before you call anyone.
Get your fixed price“Third builder we asked, first one who actually explained the planning side. Drawings were done and approved without us chasing.”
“Kitchen done in four weeks flat. They dealt with the steel beam and the electrics themselves, so nobody was waiting on anybody.”
“They gave us a fixed price in writing and stuck to it, even when the foundations needed extra depth. The site was swept every Friday.”
Design and planning take eight to twelve weeks before a spade goes in the ground.